Skip to main content

Posts

Featured

Roof trusses

Now we have the roof trusses in place, next will be the wood sheathing followed by the waterproof membrane and then the metal roof covering.

Latest posts

2nd floor

Building resumed

More excavating and a septic tank

Concrete at last!

Rebar

Underfloor heating

Styrofoam base

Styrofoam, plumbing and a well

Driveway and gravel pad

Work begins